Central London - Plant room

School Plant room replacement

Refurbish the schools plant room as existing boilers were failing and services needed updating

obligation
To ensure that the building has sufficient heating and hot water.
requirement
Supplying the school with a temporary hot water system as works were completed during term time
manufacturer
Ideal Boilers, Cetetherm hot water cylinder, Dutypoint pressurisation unit, Lowara pumps
timescale
8 Weeks

THE BRIEF

The mechanical works for plant room in a school included the following:

  • To carry out and investigate works on existing installations.
  • We took and recorded water samples from the existing LTHW circuits prior to any strip out works.
  • We stripped out gas pipework serving the boilers only back to the incoming isolating valves.
  • Strip out of the central LTHW boiler plant and replaced.
  • We provided pump condense system from boilers and flue header.
  • We have installed a new BMS systems to serve the individual boiler rooms.
  • We flushed, chemical treatment and dosed all the LTHW pipework within the main school
  • Demonstrating the complete installation is capable of the performance and method operation specified.
  • Drawings and an operation and maintenance manual were included as per the criteria

OTHER PROJECTS

London Bridge

London Bridge

commercial project

Various mechanical works including air conditioning, ventilation and plumbing

Peregrine House

Peregrine House

commercial project

Install of air conditioning, an air handling system, hot and cold-water services

Plant room - North London

Plant room - North London

commercial project

Refurbish the schools plant room as existing boilers were failing and services needed updating

Caxton Street

Caxton Street

commercial project

Full office refurbishment – a supply and install of all the equipment

Ely Place

Ely Place

commercial project

Full office refurbishment

India House

India House

commercial project

Full office refurbishment