Castle Lane

Office refurbishment - Central London

Full office refurbishment – supply and install all equipment

obligation
To ensure that the building has sufficient heating and cooling.
requirement
For the installation of the air conditioning systems to be enclosed in decorative casings
manufacturer
Daikin
installation
VRV comfort cooling/heating systems
timescale
6 Weeks

The brief

The mechanical works for this central London office refurbishment included the following:

  • To complete a degas of the existing system that was serving the basement area
  • Support the degas with paperwork to prove that the gas has been dealt with in an environmentally friendly way 
  • Installation of a new 410a based Daikin VRV comfort cooling/heating systems to serve the basement office area
  • There are two individual systems on their own controllers feeding the north side and south side respectively
  • The outdoor condenser units have been installed within the external plant compound on the roof, for which a specialist lift was required
  • Amend the refrigerant charge according to the pipe measurements
  • Carry out a pressure and evacuation test on all the systems
  • Air balancing was completed to ensure that the system was meeting the design criteria
  • All testing for the air conditioning systems has been supported by accompanying documentation including certificates
  • Drawings and an operation and maintenance manual were included as per the criteria
  • A F-Gas logbook has been completed and included as standard

Other Projects

India House

India House

commercial project

Full office refurbishment

Crayfields

Crayfields

commercial project

Installation of exposed air conditioning systems

Castle Lane

Castle Lane

commercial project

Supply and install all heating and cooling systems