Solent Gate

Office/Warehouse Refurbishment – Fareham

Full office/warehouse refurbishment – supply and install of all equipment

obligation
To ensure that the building has sufficient air conditioning and toilet extract fans.
manufacturer
Toshiba
timescale
18 weeks

The Brief

The mechanical works for this office/warehouse refurbishment included the following:

  • Installation of a new Toshiba comfort cooling to serve units 5,6 & 7
  • The larger warehouse units have had air conditioning systems installed, these are standalone
    split type systems, with ceiling mounted cassettes installed in the suspended ceiling, and externally
    mounted condenser units on the brick wall at the front of the unit.
  • Each warehouse unit has had a toilet extract twin fan system installed; the twin fan unit is
    located within the ceiling space above the tea point, which exhausts through the roof directly above the fan.
  • The controls for the toilet extract fans is located above the ceiling in the tea point.
  • Amend the refrigerant charge according to the pipe measurements
  • Carry out a pressure and evacuation test on all the systems
  • All testing for the air conditioning systems has been supported by accompanying documentation including certificates
  • Drawings and an operation and maintenance manual were included as per the criteria

Other Projects

Crayfields

Crayfields

commercial project

Installation of exposed air conditioning systems

Castle Lane

Castle Lane

commercial project

Supply and install all heating and cooling systems

London Bridge

London Bridge

commercial project

Various mechanical works including air conditioning, ventilation and plumbing