Lancaster Gate

Apartment Refurbishment – London

The refurbishment of a 225 sqm split-level apartment

obligation
Complete strip out and refurbishment
manufacturer
Various
timescale
20 weeks

The Brief

The mechanical works for this central London apartment refurbishment included the following:

  • To supply and install a new fully sealed heating system through the use of an 18kw gas fired boiler.
  • Supply and install a hot water cylinder.
  • We have supplied and installed a new cold-water booster set.
  • Supplied and installed new gas and water mains to serve the property.
  • We have installed 4 extract fans to the bathrooms throughout the property. These were fitted to include attenuators to reduce noise levels.
  • Installation of a building management system.
  • Supply and install of custom made cast iron radiators.
  • Pipework pressure test on the system
  • Disinfection of domestic water system
  • All testing for the gas and hot water systems has been supported by accompanying documentation including certificates
  • Drawings and an operation and maintenance manual were included as per the criteria

Other Projects

Crayfields

Crayfields

commercial project

Installation of exposed air conditioning systems

Castle Lane

Castle Lane

commercial project

Supply and install all heating and cooling systems

Earlsfield

Earlsfield

residential project

Domestic pipework, supply and install the sanitary ware